Test Lab Section Manager- 2nd Shift The Test Lab Section Manager will perform testing of power transformers as a finished product as well as in-process testing (as needed). These tests include polarity, resistance, insulation, load loss, temperature rise, impulse, and voltage tests. This position shall lead the final testing of units ...