Construction Scheduler - Naval Facilities Engineering Command Mid-Atlantic - Norfolk, VA
Norfolk, VA, US
$99k–$135k/year
about 2 years ago
Save Job
Summary
“This job is a civilian position and does not require military service (including commission and enlistment).”
Join the NAVAL FACILITIES ENGINEERING COMMAND team! The work is demanding, rewarding and exciting. Employees are valued, respected, and afforded a work-life balance. As a NAVFAC construction scheduler you will function as part of the project oversight team providing both pre and post award support.
Salary range is from $99,000- $135,000 (depending on qualifications and location)
Excellent Benefits Package
Work-Life Balance Programs
**Locations: Norfolk, VA; Philadelphia, PA; Jacksonville, NC (All locations will require in- office attendance 3-4 days per week)
The Construction Scheduler will be responsible for:
Analyzing schedules to determine duration and logic issues and to identify risks to the project team.
Providing Primavera P6 training and support to field office staffs.
Reviewing project baseline schedules as well as monthly updates.
Reviewing and providing opinions on Contractors Time-Impact Analysis
Participating in project schedule reviews as required
Building, modifying and maintaining schedules for projects under design
Preparing detailed schedule reports as required including critical path view, baseline vs. actual view, look ahead and milestone view
EDUCATION: BS in Engineering, Construction Management or equivalent experience. PSP certification desirable.
CONDITIONS OF EMPLOYMENT: Must be a US Citizen. Must be able to obtain and maintain an interim and/or final secret security clearance prior to entrance on duty.
Join us on Facebook: https://www.facebook.com/navfacmidatlantic
Visit our website: https://atlantic.navfac.navy.mil/NAVFAC-Worldwide/NAVFAC-Mid-Atlantic/
Job Type: Full-time
Pay: $99,000.00 - $135,000.00 per year
Benefits:
401(k)
Dental insurance
Employee assistance program
Flexible schedule
Flexible spending account
Health insurance
Life insurance
Paid time off
Retirement plan
Vision insurance
Schedule:
8 hour shift
Day shift
Monday to Friday
Application Question(s):
Must be able to obtain and maintain an interim and/or final secret security clearance prior to entrance on duty.
Education:
Bachelor's (Required)
Experience:
scheduler: 10 years (Required)
License/Certification:
Planning and Scheduling Professional (PSP) Certification (Preferred)
Willingness to travel:
25% (Preferred)
Work Location: Hybrid remote in Norfolk, VA 23511
How strong is your resume?
Upload your resume and get feedback from our expert to help land this job
How strong is your resume?
Upload your resume and get feedback from our expert to help land this job